Friday, April 26, 2024

New Oak Bay High school ready for students to call home

Share

New Oak Bay High school ready for studentsSchool might be out for summer, but that didn’t stop a few Oak Bay students from joining Education Minister Peter Fassbender on a tour of the new Oak Bay High school. The new $51.6 million, 151,000 square foot Oak Bay High is scheduled to open in September 2015.

The state-of-the-art school will be a showcase of 21st Century education where students are active and engaged, doing work that matters in full partnership with local and global communities.  Inspiring and flexible learning environments will be technologically connected, equipping students for leadership and success in their communities and increasingly sophisticated job markets.

Oak Bay High embodies a partnership and ongoing relationship with the Oak Bay community. The Neighbourhood Learning Centre and the performing arts theatre serve as a reminder that this is truly a school shared by students, families and seniors.

Throughout Oak Bay High, students have high-speed Wi-Fi access and the ability to broadcast their assignments to wireless projectors and Apple TVs found in most every classroom.

New Oak Bay High school ready for students

Features of the new school:

  • Construction of the new $51.6 million Oak Bay High began on July 5, 2013.
  • Built to LEED Gold Standard which reduces operating costs and carbon output.
  • Has a student capacity of 1,300; which allows for anticipated future enrolment growth.
  • School size:
    • New building is 17,700 square metres (more than 190,000 square feet)
    • Neighbourhood Learning Centre is 1,766 square metres (about 19,000 square feet)
  • School features:
    • Multi-level building which supports many different types of spaces for personalized learning.
    • Use of natural light and smart lights reduce energy costs and while smart sinks and water stations reduce water consumption.
    • Integrates best practices team learning areas with group work spaces designed into common features like stair wells and hallways.
    • Moveable walls enable adaptable programing and instruction; gymnasium includes a technically advanced sprung floor, which absorbs shocks, giving it a softer feel and is considered the best available for indoor sports and P.E. classes and is equipped to double as an auditorium with modern projectors and sound systems.
    • The state-of-the-art community performing arts theatre features a 420-seat capacity, proscenium stage (archway above), orchestra area and rehearsal space.
    • New soccer pitch will feature artifical turf.
    • Computer labs on every floor of the school to complement the digital research learning centre and library to support emerging high-technology learning.
  • The school district is funding 100 additional spaces for international students from its local capital reserve.
  • The District of Oak Bay has pledged $1 million to the development of the community performing arts theatre.

 


Featured photo credit: oakbay.sd61.bc.ca

mm
Victoria Buzz Staffhttps://www.victoriabuzz.com
Your inside source for Greater Victoria happenings. Established in 2012.

Read more

Latest Stories